JN Bentley Ltd have chosen ACP Concrete to design, supply and install prestressed concrete wall panels at Strongford Sewage Treatment Works, Stoke on Trent.
ACP have recently won the contract from Stepnell Construction to design, supply & install a new attenuation tank as part of enabling works for a new care home in Banner Lane, Coventry. The tank, 75m x 12m, is currently under design and is due on site late April.
ACP's contract to design, supply & install a retaining wall to the site boundary has been completed. ACP made use of their new 280mm thick prestressed concrete panels to form retaining walls up to 4.1m in height. ACP fully installed 92 vertical cantilever panels or 111m of retaining walls in only 8 days.
Pumping and Technical Services Ltd is a specialist pump engineering company. With over 40 years of experience in the design and manufacture of chemical and refinery process pumps. PTS came to ACP with a requirement for a new pump testing tank at their new manufacturing facility in Adlington, Macclesfield. The specification was for a 12m wide x 30m long x 4m high above ground water tank c/w a removable precast concrete roof. ACP's engineer recommended the use of the new 280mm thick prestressed concrete vertical panels to form the perimeter of the tank. Including initial excavation works, from start to finish the project took a total of just 7 weeks to construct. ACP completed stage one in January, which was to design, supply and install the main tank structure.
 
 
 

Enquiries

Floors / Stairs:

01900 814659

Walls, Agriculture and Bespoke:

01889 598660
 
 
Back to the top of the page