Case Studies

 
CONCRETE LABYRINTH CONSTRUCTED FOR BIG DATA INSTITUTE, OXFORD ACP Concrete Ltd supplied and installed the precast concrete panels that form the cooling labyrinth at the £30 million Big Data Institute, which is phase 2 of the Li Ka Shing Centre for Health Information and Discovery at the University of Oxford.
More
Kirk Sandall Waste Transfer Station Push walls for a new waste transfer facility for Doncaster Council required an innovative design solution and rapid installation to meet target date. Working for Willmott Dixon Construction ACP supplied and installed 1570sq metres of 280mm thick prestressed wall panels delivering the building 1 week ahead of schedule.
More
PRECAST INSTALLATION AT SNETTERTON BIOMASS POWER PLANT COMPLETED Working for Burmeister Wain Scandinavian Contractor (BWSC) ACP recently completed installation of the precast walls. Since starting on site in September 2015 ACP have manufactured and installed 2700m² of 280mm thick firewall panels to the Boiler House, Turbine Hall and Fuel Store. The final phase was the slag store installed in September this year. The innovative construction was designed by Ramboll and manufactured and installed by ACP. The giant 3D concrete jigsaw had no supporting steel frame and required a complex system of props during construction. It required precision manufacture to ensure that the pieces fitted together and the whole structure was brought together with the installation of the roof and the screed topping.
More
Retaining Wall Installed for New Whitby Supermarket ACP (Concrete) have supplied and installed 232 linear metres of retaining wall panels up to 4.1m high in 13 days at the new Sainsbury's store site in Whitby.
More
 
 

Enquiries

Floors / Stairs:

01900 814659

Walls, Agriculture and Bespoke:

01889 598660
 
 
Back to the top of the page